EVS reported | Aramco built Saudi Lithium JV with Ma'aden


Saudi Energy Form Aramco and Metals Company Company and Metals Company Ma'aden signs a contract to build a joint employee in Saudi Arabia to begin Lithium production in 2027.

The proposed JV is the purpose of issuing Lithium from the highest deposit deposits and the development of Lithium Extraction Extraction (DLE) Extraction (DLE) Only the Lithium Arabian demand was expected to grow twenty-three between 2024 and 2030, supporting 500,000 batteries in the EV and Aramco.

As part of its operation, Aramco has identified several locations with the high lithium of victimization of 400 million.

Nasir K. Al-Naimi, the Upstream President

“The proposed JV will allow the issuing of the changing minerals,” said Nasir K. al-Naimi, the Aramco Upre-president. “We expect this partnership will enhance the world's leading businesses will use low-cost business, technical experience, integrated Subsersurface and the combined lithium search.”

Source: Aramco





Source link

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top